Thursday, 12 November 2009
Tanking and re-tiling my daughter's shower.
Back in November of 2009 I volunteered to re-do my daughter Helen's shower. Her architect husband spec'd the job and bought the materials and I implemented the design. Here's the photos of the tanking and tiling job I did. The ceramic "floor" tiles Ewan pick for the wall were a pig to cut on my tile cutter. One tile took half a hour to cut. Thanks goodness there was not too many cuts.
Labels:
shower tiling tanking
Subscribe to:
Posts (Atom)